To Do List
- Decorate the 3-season porch
- Remodel Kitchen
- Buy a matching gas range
- Buy & install over-range microwave
- Install granite kitchen counter tops
- Tile or hardwood kitchen floor
- Paint kitchen cabinets
- Finish the 2nd floor master bedroom
Gutt current building materials (completed 3/21/2010)
Reinforce floorboards to prevent squeaking
Heighten ceiling frame
Rewire with electrical work (completed 11/21/2010)
Install venting and insulation
- Build built-ins
- Install drywall
- Paint
- Install carpeting
- Landscape
- Install a vent-less gas fireplace
Install central AC (completed 5/16/2011)
- Tile the entry way & fireplace floor
- Finish the basement
- Laundry room
- 2nd bathroom
- Pantry
- Movie room