To Do List

  • Decorate the 3-season porch
  • Remodel Kitchen 
    • Buy a matching gas range
    • Buy & install over-range microwave
    • Install granite kitchen counter tops
    • Tile or hardwood kitchen floor
    • Paint kitchen cabinets
  • Finish the 2nd floor master bedroom
    • Gutt current building materials (completed 3/21/2010)
    • Reinforce floorboards to prevent squeaking
    • Heighten ceiling frame
    • Rewire with electrical work (completed 11/21/2010)
    • Install venting and insulation
    • Build built-ins
    • Install drywall
    • Paint
    • Install carpeting
  • Landscape
  • Install a vent-less gas fireplace
  • Install central AC (completed 5/16/2011)
  • Tile the entry way & fireplace floor
  • Finish the basement
    • Laundry room
    • 2nd bathroom
    • Pantry
    • Movie room